通風管道施工現(xiàn)場吊架安裝技術指南

來源:http://www.fsjt-gov.com 日期:2025-06-10 發(fā)布人:創(chuàng)始人

  在通風空調系統(tǒng)工程中,吊架作為管道系統(tǒng)的核心支撐構件,其安裝質量直接影響系統(tǒng)運行安全與使用壽命。本文從施工準備、操作要點、質量管控三個維度,解析通風管道吊架的規(guī)范化安裝流程。

  In ventilation and air conditioning system engineering, hangers serve as the core supporting components of piping systems, and their installation quality directly affects the safety and service life of the system operation. This article analyzes the standardized installation process of ventilation duct hangers from three dimensions: construction preparation, operational points, and quality control.

  施工前準備:技術交底與材料驗收

  Preparation before construction: technical briefing and material acceptance

  安裝前需完成三維深化設計,將管道走向、吊架點位與建筑結構圖疊加,通過BIM技術碰撞檢測,避免與梁柱、管線沖突。技術人員需向施工班組進行專項交底,明確吊架規(guī)格、間距及特殊節(jié)點處理要求。材料進場驗收時,重點關注角鋼、槽鋼的壁厚偏差,國標要求Q235B鋼材壁厚允許偏差≤0.5mm,防腐涂層附著力需達1級標準。對于抗震支吊架,需核查C型槽鋼內置齒牙深度是否≥2mm,這是保證抗震性能的關鍵指標。

  Before installation, a 3D detailed design must be completed to overlay the pipeline direction, hanger points, and building structure diagram. BIM technology collision detection should be used to avoid conflicts with beams, columns, and pipelines. Technical personnel need to provide special instructions to the construction team, clarifying the specifications, spacing, and special node handling requirements of the hangers. When inspecting the materials upon arrival, special attention should be paid to the wall thickness deviation of angle steel and channel steel. The national standard requires that the allowable deviation of Q235B steel wall thickness should be ≤ 0.5mm, and the adhesion of the anti-corrosion coating should meet the Level 1 standard. For seismic supports and hangers, it is necessary to verify whether the depth of the teeth embedded in the C-shaped channel steel is ≥ 2mm, which is a key indicator to ensure seismic performance.

  定位放線:精準確定安裝基準

  Positioning and laying out: accurately determining the installation benchmark

  依據(jù)設計圖紙,采用全站儀或紅外線測距儀進行軸線投測,將控制點引測至樓板,誤差控制在±3mm以內。吊架間距設置需遵循規(guī)范:水平矩形風管邊長≤2000mm時,間距≤3m;圓形風管直徑≥800mm時,間距≤2.5m。在穿樓板、變形縫等位置,需增設防晃支架,間距較常規(guī)縮短30%。某會展中心項目實踐表明,采用彈簧秤校核膨脹螺栓拉拔力,當M12螺栓達5.6kN時方可進入下道工序,有效避免吊架脫落風險。

  According to the design drawings, a total station or infrared rangefinder is used for axis projection, and the control points are measured to the floor slab with an error controlled within ± 3mm. The spacing between hangers should follow the specifications: when the side length of a horizontal rectangular air duct is ≤ 2000mm, the spacing should be ≤ 3m; when the diameter of a circular air duct is ≥ 800mm, the spacing should be ≤ 2.5m. Anti sway brackets should be added at locations such as through floor slabs and deformation joints, and the spacing should be reduced by 30% compared to conventional methods. The practice of a certain exhibition center project has shown that using a spring scale to verify the pulling force of expansion bolts, the next process can only be carried out when the M12 bolt reaches 5.6kN, effectively avoiding the risk of hanger detachment.

20221114014032232.jpg

  吊架制作:工藝控制與防腐處理

  Hanger production: process control and anti-corrosion treatment

  下料采用數(shù)控等離子切割機,切口毛刺高度≤0.3mm,組對間隙控制在0-1mm。焊接時,角鋼搭接長度需≥2倍寬邊,滿焊高度不低于母材厚度0.8倍。某機電公司工藝標準顯示,雙拼槽鋼吊架需設置綴板連接,綴板間距≤800mm,確保整體穩(wěn)定性。防腐處理采用環(huán)氧富鋅底漆+丙烯酸聚氨酯面漆體系,干膜厚度分別≥75μm、60μm,鹽霧試驗可耐受1000小時。

  The cutting is carried out using a CNC plasma cutting machine, with a burr height of ≤ 0.3mm and a gap control of 0-1mm. During welding, the overlap length of the angle steel should be ≥ 2 times the width of the edge, and the full welding height should not be less than 0.8 times the thickness of the base metal. According to the process standards of a certain electromechanical company, double spliced channel steel hangers need to be connected with patch plates, with a spacing of ≤ 800mm between the patch plates to ensure overall stability. The anti-corrosion treatment adopts an epoxy zinc rich primer+acrylic polyurethane topcoat system, with dry film thicknesses of ≥ 75 μ m and 60 μ m respectively. The salt spray test can withstand 1000 hours.

  安裝固定:關鍵工序的質量控制

  Installation and fixation: quality control of key processes

  膨脹螺栓安裝時,鉆孔直徑需比螺栓直徑大4mm,深度誤差≤5mm,清孔后注入錨固膠。對于混凝土強度≥C30的樓板,M16膨脹螺栓抗剪強度可達12kN。吊架垂直度偏差需控制在H/1000以內,使用磁力線墜檢測。當管道與吊架間存在間隙時,需采用經(jīng)防腐處理的木墊塊填塞,厚度≥50mm,避免剛性接觸產(chǎn)生冷橋。

  When installing expansion bolts, the drilling diameter should be 4mm larger than the bolt diameter, with a depth error of ≤ 5mm. After cleaning the hole, anchor glue should be injected. For floor slabs with concrete strength ≥ C30, the shear strength of M16 expansion bolts can reach 12kN. The verticality deviation of the hanger should be controlled within H/1000, and magnetic line drop detection should be used. When there is a gap between the pipeline and the hanger, anti-corrosion treated wooden pads with a thickness of ≥ 50mm should be used to fill it to avoid rigid contact and cold bridges.

  特殊場景處理:復雜工況的解決方案

  Special scenario handling: solutions for complex working conditions

  在斜屋面或曲面結構中,采用可調節(jié)球型支座,通過萬向接頭實現(xiàn)±15°角度補償。對于并行管道,使用共架設計,主吊架采用41×41×4mm熱鍍鋅槽鋼,次管道通過U型管箍固定,間距≤1.5m。在穿防火墻位置,吊架需外擴300mm,并設置柔性阻燃套管,某數(shù)據(jù)中心項目驗證,該措施可降低火災蔓延風險85%。

  In sloping roofs or curved structures, adjustable spherical supports are used to achieve ± 15 ° angle compensation through universal joints. For parallel pipelines, a common frame design is used, with the main hanger using 41 × 41 × 4mm hot-dip galvanized channel steel, and the secondary pipeline fixed with U-shaped pipe clamps with a spacing of ≤ 1.5m. At the location where the firewall passes through, the hanger needs to be expanded by 300mm and a flexible flame-retardant sleeve should be installed. A data center project has verified that this measure can reduce the risk of fire spread by 85%.

  驗收與維護:全周期管理要點

  Acceptance and Maintenance: Key Points for Full Cycle Management

  安裝完成后,需進行三項檢測:1. 荷載試驗,加載1.5倍設計重量,持續(xù)2小時,變形量≤H/250;2. 防腐層檢測,采用電火花檢漏儀,1.5kV電壓下無擊穿;3. 抗震性能驗證,模擬7度地震波,支架位移量<50mm。運營期間,建議每半年檢查吊架連接螺栓扭矩,M16螺栓預緊力需保持在80-100N·m,并補涂防銹漆。

  After installation, three tests are required: 1 Load test, loading 1.5 times the design weight for 2 hours, deformation ≤ H/250; 2. Anti corrosion layer testing, using an electric spark leak detector, with no breakdown at 1.5kV voltage; 3. Seismic performance verification, simulating a 7-degree earthquake wave with a support displacement of less than 50mm. During operation, it is recommended to check the torque of the hanger connection bolts every six months, maintain the M16 bolt pre tightening force at 80-100N · m, and apply anti rust paint.

  通風管道吊架安裝需貫徹“精準定位、規(guī)范制作、嚴格驗收”十二字方針,通過BIM技術、智能檢測設備與新型連接件的協(xié)同應用,構建起從設計到運維的全生命周期質量保障體系,為建筑機電系統(tǒng)安全運行奠定堅實基礎。

  The installation of ventilation duct hangers should adhere to the twelve character policy of "precise positioning, standardized production, and strict acceptance". Through the collaborative application of BIM technology, intelligent detection equipment, and new connectors, a full life cycle quality assurance system from design to operation and maintenance should be established, laying a solid foundation for the safe operation of building electromechanical systems.

  本文由濟南通風管道友情奉獻.更多有關的知識請點擊:http://www.fsjt-gov.com真誠的態(tài)度.為您提供為全面的服務.更多有關的知識我們將會陸續(xù)向大家奉獻.敬請期待.

  This article is a friendly contribution from Shandong Ventilation Duct For more information, please click: http://www.fsjt-gov.com Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.