隨著使用時(shí)間的不斷增長(zhǎng),
濟(jì)南通風(fēng)管道會(huì)積累大量雜質(zhì)。這些雜質(zhì)將在管道中儲(chǔ)存很長(zhǎng)時(shí)間,并在運(yùn)行過(guò)程中加速它的油冷凝。溫度轉(zhuǎn)換過(guò)高,會(huì)對(duì)氣壓閥、液壓等部件造成損壞,并對(duì)正常運(yùn)行產(chǎn)生很大影響。因此,定期清理通風(fēng)管道設(shè)備是非常必要的。如何清理?下面跟隨小編一起來(lái)看看吧
With the continuous growth of service time, Jinan ventilation duct will accumulate a lot of impurities. These impurities will be stored in the pipeline for a long time and accelerate its oil condensation during operation. If the temperature conversion is too high, it will damage the air pressure valve, hydraulic pressure and other components, and has a great impact on the normal operation. Therefore, it is necessary to clean the ventilation duct equipment regularly. How to clean up? Let's follow Xiaobian to have a look
(1)風(fēng)管與風(fēng)機(jī)連接時(shí),應(yīng)在進(jìn)風(fēng)口和出風(fēng)口加裝軟接頭。軟接頭的橫截面尺寸應(yīng)與風(fēng)扇進(jìn)氣口和排氣口的橫截面尺寸相同。軟管接頭可以由帆布、人造革和其他材料制成。軟管的長(zhǎng)度不應(yīng)小于200,并且松緊應(yīng)適當(dāng)。軟管可以緩沖風(fēng)扇的振動(dòng)。

(1) When the air duct is connected with the fan, the soft joint should be installed at the air inlet and outlet. The cross-sectional dimension of the flexible joint shall be the same as that of the fan inlet and outlet. Hose connections can be made of canvas, synthetic leather and other materials. The length of the hose should not be less than 200, and the tightness should be appropriate. The hose can cushion the vibration of the fan.
(2)風(fēng)管連接除塵設(shè)備和加熱設(shè)備時(shí),設(shè)備安裝完畢后,根據(jù)理論測(cè)繪圖暫停預(yù)制安裝。
(2) When the air duct is connected with the dust removal equipment and heating equipment, the prefabrication and installation shall be suspended according to the theoretical mapping map after the equipment is installed.
(3)濟(jì)南通風(fēng)管道安裝時(shí),風(fēng)管預(yù)制時(shí)應(yīng)打開進(jìn)出口。如果安裝結(jié)束時(shí)風(fēng)管需要打開,其接口應(yīng)緊密。
(3) When Jinan ventilation duct is installed, the inlet and outlet should be opened when the air duct is prefabricated. If the air duct needs to be opened at the end of installation, its interface should be tight.
(4)輸送冷凝水或水分含量大的氣體時(shí),其水平管道應(yīng)設(shè)置坡度,并在低點(diǎn)與排水管連接。安裝時(shí),風(fēng)管底部不應(yīng)出現(xiàn)縱向接縫,底部接縫應(yīng)暫停密封處理。
(4) When transporting condensate water or gas with large moisture content, the horizontal pipeline should be set with slope and connected with drainage pipe at low point. During installation, there should be no longitudinal joint at the bottom of the air duct, and the sealing treatment of the bottom joint should be suspended.
(5)對(duì)于輸送易燃易爆氣體的鋼板風(fēng)管,應(yīng)在風(fēng)管的連接法蘭處安裝跨接導(dǎo)線,并與靜電接地網(wǎng)連接。
(5) For the steel plate air duct conveying inflammable and explosive gases, the jumper wire should be installed at the connecting flange of the air duct and connected with the electrostatic grounding grid.
(6)當(dāng)水平風(fēng)道高度在4m以上時(shí),裝置人員應(yīng)系安全帶。腳手架或移動(dòng)式支架上的跳板應(yīng)固定好,跳板寬度應(yīng)契合安全規(guī)范,在腳手架上的裝置人員宜攜東西袋,避免東西或電鉆等物掉落傷人。
(6) When the height of horizontal air duct is more than 4m, the installation personnel shall wear safety belt. The springboard on the scaffold or mobile support should be fixed, and the width of the springboard should conform to the safety regulations. The installation personnel on the scaffold should carry bags to avoid falling objects or electric drills to hurt people.
(7)雙吊桿支架在風(fēng)道內(nèi)就位后,橫臂應(yīng)平直,吊桿不得改變,雙吊桿應(yīng)受力均勻。
(7) After the double suspender bracket is in place in the air duct, the cross arm shall be straight, the suspender shall not be changed, and the double suspender shall be stressed evenly.
濟(jì)南通風(fēng)管道
Jinan ventilation duct
濟(jì)南通風(fēng)管道好每三個(gè)月清洗一次,這樣不僅可以保證平時(shí)正常運(yùn)行,而且可以延長(zhǎng)通風(fēng)管道的使用壽命。
Jinan good ventilation pipe cleaning every three months, this can not only ensure normal operation, but also can extend the service life of the ventilation pipe.